Today, I got 15 minutes only and I tested SM40/PST double stacking configuration.
SM40/Borg 45ED/PST etalon/BF10, double stacking on the cheap:-
16:01 (HKT) Close to full disc
16:02 (HKT)
16:03 (HKT) Full disc by drift method
16:05 (HKT) 2x barlows
16:06 (HKT)
No comments:
Post a Comment